>
B2B stocking distributor · OEM / EMS / wholesale enquiries only Mon-Fri 09:00-18:00 (UTC+8) · Contact sourcing

Procurement Note · 4 min read

X49SD8MSB2SI Stock Supplier | Crystal RFQ and Lot Control

A crystal BOM line without frequency and load capacitance is not a part number. Here is what a purchaser must capture before the RFQ.

Technical diagram cover for X49SD8MSB2SI: procurement note

Frequency-control parts generate a disproportionate number of avoidable sourcing errors because the most important parameters are often left off the purchase description. The X49SD8MSB2SI is recorded in our part master as a YXC crystal / oscillator in the Crystals & Oscillators category, with 14,827 pcs in our merged B2B inventory. The quantity and category are evidenced fields. The electrical parameters are not in our stock file, and this note explains how to make sure the RFQ captures them anyway.

What the stock figure does and does not mean

The 14,827 pcs figure is the quantity recorded per exact manufacturer part number when the page was generated. It is not an allocation. Crystal lines are often bought in tight lot consistency: a design tuned during prototype validation may be sensitive to load capacitance and frequency tolerance, and engineers frequently prefer a single date-code lot for a production build. A stock snapshot cannot tell you whether the quantity available spans one lot or several, so the quotation must confirm both the allocation and the date-code window before you release the PO.

Frequency is the other reason to be precise. Our catalogue includes H6OSI-SUG-8M, OT2JI-111-12M, OT2JI-111-25M and OT322512MJBA4SL under the same category. These are distinct ordering codes with distinct frequency or construction characteristics, not variants of one generic "crystal" line. A BOM that lists only the category and a quantity gives a buyer no protection against the wrong frequency being quoted.

MOQ, reel quantity and lead time

For crystal and oscillator lines, MOQ is usually driven by the tape-and-reel format and by the manufacturer's standard packing unit, both of which are suffix-dependent. Our part master records MOQ as "confirm on quote" for this line rather than publishing a guessed number. On the RFQ, state the required quantity, whether full reels only are acceptable, and whether a single lot is required. Ask for the lead time in writing and, if the build has a fixed production date, state that date so the quotation can commit to a realistic window rather than an optimistic one.

Do not assume that a smaller or larger SMD package with the same frequency is a drop-in. Package dimensions set the land pattern, and the load capacitance and ESR interact with the oscillator circuit on the PCB. Any change is a design change, not a purchasing shortcut.

Date codes, traceability and compliance documents

  • State the required date-code window and whether a single production lot is mandatory.
  • Request the official manufacturer datasheet with frequency tolerance and load capacitance for the exact MPN.
  • Request RoHS and REACH SVHC declarations plus a certificate of conformance tied to the lot.
  • For long-life or regulated equipment, ask for lot traceability and keep it with the AVL record.

Our parameter fields are compiled from supplier stock data and manufacturer part-number conventions and are labelled as sourcing references. Verify every electrical value against the official YXC datasheet for X49SD8MSB2SI before design-in or production release. Compliance status appears as "documentation on request" because declarations are issued for the actual lot with the quotation, not as a generic family statement.

What to put on the RFQ

  1. Full ordering code including every suffix character, one line per MPN.
  2. Required frequency, tolerance and load capacitance as a confirmation note from engineering.
  3. Quantity, reel preference, required delivery date and date-code window.
  4. Documentation set: datasheet, RoHS / REACH, certificate of conformance, lot traceability.
  5. Instruction that any alternative must be labelled as a research lead and approved in writing.

We answer in writing with confirmed stock, lead time, MOQ and a written quotation, and we never publish an invented public price or silently substitute an alternative. Browse the crystal category index or the YXC brand index, then send the BOM through the sourcing contact page. More RFQ checklists are in the technical resources library.

Frequently asked questions

Answers are rendered from the same structured FAQ list that feeds the FAQPage structured data on this page.

Datasheet & compliance documents

Leaving an email is optional. Enter your work email and the sourcing team will send the official manufacturer datasheet, RoHS / REACH declarations and the lot traceability documents for this exact MPN.

Or continue to the quote form without leaving an email. No account or login is required.